réensablement pointe du cap ferret

Cap Ferret: Emergency re-enactment work

The ocean continues to threaten the tip of Cap Ferret. Last weekend, with the great tidal coefficients, the waves gnawed three meters of beach in the space of a few hours. A brutal erosion that threatened to open a breach at the Pointe du Ferret, endangering its residents.
It is a time trial race that is taking place at the Pointe du Cap Ferret. In three weeks the ocean will return even stronger with new large tidal coefficients. Construction equipment must quickly reinforce the dune. The prefecture gave the municipality of Lège-Cap-Ferret the emergency go-ahead to start the work.